Selasa, 8 Mei 2012

* Quotation Scaffolding

Quotation : AFFAA RESOURCES

                                  Desription                                             
  • Frame inclusive jack base,cross brace & joint Pins - pcs  i-Rm3.00   d-Rm1.50
  • G.I pipe inclusive swivel clamp - pcs    i-3.00       d-1.50
  • Wall tie excluding supply of Drop-in Anchor - pcs  i-Rm3.00  d-Rm1.50
  • Safety net - pcs    i-Rm3.00   d-Rm1.50
  • Access Ladder  - pcs  i-Rm3.00   d-Rm1.50
          i - Install         d - Dismantle


_____________________________________________________________________

Quotation : AFFAA RESOURCES

Inspection Scaffolding in KL,Selangor

- Lump sum - RM1,400.00 - (p/month).

Tiada ulasan:

Catat Ulasan